phone Phone
+622162308348
menu

PT. Jack Anugerah Indonesia

sql
Instalasi Pipa Toro
Instalasi Pipa Toro
Instalasi Pipa Toro
Instalasi Pipa Toro
Instalasi Pipa Toro
Instalasi Pipa Toro
Instalasi Pipa Toro

Jual Instalasi Pipa Toro




Spesifikasi Instalasi Pipa Toro

Instalasi Pipa Toro

Cara Instalasi / How To Install Toro 25 Pipe

1. Make sure that the cutter blades does not have irregularities and are properly sharpened; • Cut the tube perpendicular to its axis; • Check that the cutting section is perfectly flat and that there are no defects due to nippers misuse.

2. Joints ends must be smooth and the edges carefullybevelled.

3. Mark with a pencil the coupling depth on the pipe (look at the following table “welding depth”)

4. Heat both elements to be jointed, inserting them in the appropriate matrices of the welder device. Melting temperature should be 260°C. Wait for the due time as indicated by the standard DVS 2207.

5. After a few seconds, pull out the pipe and the fitting and joint them immediately

6. Push the pipe without any rotation until it reaches the marked welding depth. Follow indications on cooling time according with Standard 2207 part. 11.

 

Welding Machine PPR Pipe Toro

Untuk konsultasi alat dan bahan pemasangan, dapat langsung menghubungi :

PT. Jack Anugerah Indonesia

Lindeteves Trade Center (LTC) Glodok Lt.2 Blok C30E No 2 Jakarta Barat
Jakarta , Indonesia
Telepon : (+62) 2162308348
(+62) 81287233888